by Pascal Monin | Jun 29, 2018 | All achievements, Elevator shafts, Hydraulics, steaming, vibration
Elevator shaft mold for all types of building. Prefabrication mold with hydraulically retractable core Information supplied by the customer: cross-section and final thickness. Design office work: Mould design. Demoulding: 1 piece per day Special features: Moulds for...
by Pascal Monin | Jun 29, 2018 | All achievements, Architectural concrete
Design office work: A lot of work, as the surfaces could not be developed from the 3D plan supplied by the customer, all the sections were changing and rotating, and the geometry was very complex. A lot of boiler-making and finishing work for these architectural...
by Pascal Monin | Jun 29, 2018 | All achievements, Architectural concrete
Sunshades on the facade of a modern art exhibition building The 3D drawing of the part was provided by the customer. The design office had to do a great deal of work on the non-developable surfaces, as all the sections were changing and rotating, with very complex...
by Pascal Monin | Jun 29, 2018 | All achievements, Architectural concrete
Information provided by the customer : 2D concrete parts drawing Design office work: 3D drawing of final parts and design of concrete prefabrication molds. Delayed demolding Simultaneous production quantity 1 piece per day. Technical difficulties : The quality of the...
by Pascal Monin | Jun 29, 2018 | All achievements, Sanitation
Make a concrete mold for a concrete part to allow square manholes to be connected to round manhole bases Design office work: Modeling non-developable surfaces. The customer provides us with a paper drawing of the concrete part, which we then redesign. If we...