Sunshades on the facade of a modern art exhibition building
The 3D drawing of the part was provided by the customer.
The design office had to do a great deal of work on the non-developable surfaces, as all the sections were changing and rotating, with very complex geometry.
As a result, the boilermaking work involved in making the prefabrication mold was also very important, as was the finishing for these architectural parts, which had to emerge from the mold flawlessly.
Deferred demolding: self-compacting concrete
Simultaneous production quantity: 1 piece per day.
Technical difficulties
- Boilermaking of non-developable surfaces
- Precision on large toroidal parts
Country of destination: Switzerland, Uetikon am See
Destination: Modern art showroom.