{"id":29047,"date":"2018-06-29T14:35:23","date_gmt":"2018-06-29T12:35:23","guid":{"rendered":"https:\/\/ctvs.eu\/concrete-brise-soleil-on-the-facade-of-a-modern-art-exhibition-building-architectural-concrete-screen-design\/"},"modified":"2024-09-08T17:11:56","modified_gmt":"2024-09-08T15:11:56","slug":"concrete-brise-soleil-on-the-facade-of-a-modern-art-exhibition-building-architectural-concrete-screen-design","status":"publish","type":"post","link":"https:\/\/ctvs.eu\/en\/concrete-brise-soleil-on-the-facade-of-a-modern-art-exhibition-building-architectural-concrete-screen-design\/","title":{"rendered":"Concrete brise-soleil on the fa\u00e7ade of a modern art exhibition building architectural concrete, &#8220;Screen&#8221; design"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.7.7&#8243; _module_preset=&#8221;19f5dbdf-2bee-4d65-aa6c-d33a9241ad8d&#8221;][et_pb_row column_structure=&#8221;1_2,1_2&#8243; _builder_version=&#8221;3.25&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221;][et_pb_column type=&#8221;1_2&#8243; _builder_version=&#8221;3.25&#8243; custom_padding=&#8221;|||&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_text admin_label=&#8221;Text&#8221; _builder_version=&#8221;4.8.0&#8243; link_text_color=&#8221;#000000&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221;]<\/p>\n<p><strong>Design office work:<\/strong> A lot of work, as the surfaces could not be developed from the 3D plan supplied by the customer, all the sections were changing and rotating, and <strong>the geometry was very complex<\/strong>.<\/p>\n<p>A lot of boiler-making and finishing work for these architectural pieces, which have to come out of the mold flawless.<\/p>\n<p>Type of demoulding: <a href=\"\/\">Precast mould<\/a> with deferred demoulding &#8211; self-compacting concrete<\/p>\n<p>Simultaneous production quantity: 1 piece per day.<\/p>\n<p><strong>Technical difficulties<\/strong>:<\/p>\n<p>There are small bending radii to make the S and a modification of the cross-section throughout the part.<\/p>\n<p>What&#8217;s more, the parts are bolted together, so the precision of the parts produced by the molds must be high.<\/p>\n<p>Boilermaking work is complicated by non-developable surfaces and the need for precision on large toroidal parts.<\/p>\n<p><strong>Country of destination:<\/strong> Switzerland Uetikon am See<\/p>\n<p>Destination: Modern art showroom.<\/p>\n<p>[\/et_pb_text][\/et_pb_column][et_pb_column type=&#8221;1_2&#8243; _builder_version=&#8221;3.25&#8243; custom_padding=&#8221;|||&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_image src=&#8221;https:\/\/ctvs.eu\/wp-content\/uploads\/2018\/06\/screen-beton-architectonique-3.jpg&#8221; alt=&#8221;Screen: Concrete sunshades on the facade of an exhibition building&#8221; title_text=&#8221;Screen: Concrete sunshades on the facade of an exhibition building&#8221; align=&#8221;center&#8221; _builder_version=&#8221;4.6.5&#8243; _module_preset=&#8221;default&#8221;][\/et_pb_image][\/et_pb_column][\/et_pb_row][\/et_pb_section][et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.7.5&#8243; _module_preset=&#8221;default&#8221;][et_pb_row _builder_version=&#8221;4.6.5&#8243; _module_preset=&#8221;0ffdd6ef-bbe0-497b-b790-fe8bebaab336&#8243;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.6.5&#8243; _module_preset=&#8221;default&#8221;][et_pb_gallery gallery_ids=&#8221;29051,29048,29050&#8243; posts_number=&#8221;12&#8243; _builder_version=&#8221;4.6.5&#8243; _module_preset=&#8221;fad94709-549d-4246-b6e9-b215909136d3&#8243;][\/et_pb_gallery][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Design office work: A lot of work, as the surfaces could not be developed from the 3D plan supplied by the customer, all the sections were changing and rotating, and the geometry was very complex. A lot of boiler-making and finishing work for these architectural pieces, which have to come out of the mold flawless. [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":29050,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[181,192],"tags":[],"class_list":["post-29047","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-achievements","category-architectural-concrete"],"_links":{"self":[{"href":"https:\/\/ctvs.eu\/en\/wp-json\/wp\/v2\/posts\/29047","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ctvs.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ctvs.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ctvs.eu\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/ctvs.eu\/en\/wp-json\/wp\/v2\/comments?post=29047"}],"version-history":[{"count":2,"href":"https:\/\/ctvs.eu\/en\/wp-json\/wp\/v2\/posts\/29047\/revisions"}],"predecessor-version":[{"id":29056,"href":"https:\/\/ctvs.eu\/en\/wp-json\/wp\/v2\/posts\/29047\/revisions\/29056"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ctvs.eu\/en\/wp-json\/wp\/v2\/media\/29050"}],"wp:attachment":[{"href":"https:\/\/ctvs.eu\/en\/wp-json\/wp\/v2\/media?parent=29047"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ctvs.eu\/en\/wp-json\/wp\/v2\/categories?post=29047"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ctvs.eu\/en\/wp-json\/wp\/v2\/tags?post=29047"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}