by Pascal Monin | Jun 29, 2018 | All achievements, Electrical distribution, Hydraulics, steaming, vibration
Manufacture of concrete pulling chambers for electrical distribution Information provided by the customer: Drawing of the concrete part from which the design office created the mold. Type of demoulding: deferred, 1 piece per day. This prefabrication mold is equipped...
by Pascal Monin | Jun 29, 2018 | All achievements, Containers, Environment
Information supplied by customer: drawing of concrete part Design office work: design of a prefabrication mold for this containerDemolding of the core at mid-cooling, production of 1 part per day This concrete part has a very small draft on the core, which poses...
by Pascal Monin | Jun 29, 2018 | All achievements, Containers, Environment
Engineering: Design of the concrete mold core with shrink-fit faces for deferred demolding. Simultaneous production quantity: 1 part per day, manufactured in a specific concrete for nuclear waste. 3 sets of moulds. Specific features: High geometrical constraints with...
by Pascal Monin | Jun 29, 2018 | All achievements, Sanitation
Prefabrication mold for concrete slot channel with sidewalk for motorway tunnel. Length 4m, deferred demolding, shrink core. Slide-mounted for easy removal. 1-piece...
by Pascal Monin | Jun 29, 2018 | All achievements, Formwork
Cast-in-place Part drawing and chute geometry supplied by customer. Design office work: Design of metal formwork, taking into account the customer’s safety requirements. Type of demoulding: deferred, cast-in-place, 1 pour per day Special features Technical...