Cast-in-place
Part drawing and chute geometry supplied by customer.
Design office work: Design of metal formwork, taking into account the customer’s safety requirements.
Type of demoulding: deferred, cast-in-place, 1 pour per day
Special features
Technical difficulties: very large part: 12 metres long, made with 2 6-metre moulds that can be butted together
Country of delivery: STEP Feyssine in Lyon on the Boulevard de ceinture,
Customer : Bouygues Wastewater treatment plant for 300,000 inhabitants