Manufacture of a metal formwork to produce a triple concrete chute for a wastewater treatment plant – STEP

Date et catégories :

Jun 29, 2018 | All achievements, Formwork

Cast-in-place

Part drawing and chute geometry supplied by customer.

Design office work: Design of metal formwork, taking into account the customer’s safety requirements.

Type of demoulding: deferred, cast-in-place, 1 pour per day

Special features

Technical difficulties: very large part: 12 metres long, made with 2 6-metre moulds that can be butted together

Country of delivery: STEP Feyssine in Lyon on the Boulevard de ceinture,

Customer : Bouygues Wastewater treatment plant for 300,000 inhabitants

Steel formwork for in-situ casting - Triple STEP trunking