Manufacture of 3 different concrete prefabrication molds for the envelope, casing and roof of an ENEDIS electrical transformer substation.
Information provided by the customer: concrete geometry and desired production rates.
Our engineering department designed the concrete molds and coordinated the bake-out, hydraulic and vibration partners required for production of the ENEDIS electrical transformer substation.Simultaneous production quantity: Several parts per day Specific features: Elimination of closing screws, PLC-controlled hydraulic maneuvering, electrical bake-out.Technical challenges: Integration of productivity constraints Country of delivery: France Destination public distribution ENEDIS or private.
Information provided by the customer: concrete geometry and desired production rates.
Our engineering department designed the concrete molds and coordinated the bake-out, hydraulic and vibration partners required for production of the ENEDIS electrical transformer substation.Simultaneous production quantity: Several parts per day Specific features: Elimination of closing screws, PLC-controlled hydraulic maneuvering, electrical bake-out.Technical challenges: Integration of productivity constraints Country of delivery: France Destination public distribution ENEDIS or private.