Design office work: design of 7 molds for the production of 2 types of beams used in the construction of load-bearing slabs. Type of demoulding: deferred Type of production: precast prestressed concrete Simultaneous production quantity: 2 parts per day with steaming Technical difficulties : the absence of a draft between the end blocks requires the use of sliding release keys.
The large number of through-holes requires high-precision hydraulic demoulding. Country of destination: Switzerland – Muttenz near Basel Destination: Production of beams for load-bearing structures.