Destination: ENEDIS public or private distribution.
Production of 3 different molds for the envelope, slab and roof of the electrical transformer substation.
The customer provided us with the geometry of the concrete transformer station and the production rates.
Design office work: Design of concrete molds and coordination of partners for steaming, hydraulics and vibration.
Demoulding: deferred
Simultaneous production quantity: Several parts per day
Special features: no closing screws, PLC-controlled hydraulic demolding, electric or steam steaming to accelerate concrete drying.
Technical challenges: Integrating customer productivity constraints
Delivery country: France