Design office work: Design of precast concrete molds for deferred demolding.
Information provided by the customer: geometry of the concrete casing for the electrical transformer substation, and production rate.
Simultaneous production volume: several substation casings per day
Special features: Optimization of mold operation times.
Technical difficulties: Integration of ergonomic constraints to avoid workstation fatigue.
Country of delivery: France.
Public distribution ENEDIS or private.