UHPC mold – SNCF footbridge at Le Cannet des Maures near Brignoles.
Information provided by the customer: 3D drawings with concrete part geometry.
Our engineering department designed a mold for manufacturing the parts.
An associated frame enables “contact” concreting.
Delayed demolding
Special features: the concrete parts are post-tensioned, the manufacturing method is “conjugated joints”.
Technical difficulties : Ensuring the sealing of the various mold components, all with complex surfaces.
Forming surfaces must be guaranteed to look perfect.
Country of delivery: Switzerland for French construction sites.
Purpose: Pedestrian, technical and architectural footbridge.